[email protected]
+65.6532.4383
Production Technologist support for an independent operating company in South East Asia with a focus on ESP projects.
ALS was requested to provide detailed inspections of ESP manufacturing processes for a Houston-based Operator.
ALS has been supporting a technology company to introduce a new deployment method for their downhole equipment for gas wells. The equipment has traditionally been deployed on tubing and in order to make it more accessible and cost effective the company have decided to make their product installation work without need for a rig.
ALS is presently monitoring approximately 150 ESP wells across several operators 24-7. ESPs from 5 different service companies are being independently monitored and daily events are being tracked.
ALS was initially brought in to assist with preparation of a technical ITB document for a wireline retrievable ESP project. Since the project has moved into the planning and procurement phase ALS has been assisting with manufacturing inspections and site integration test planning.
A North Sea operator approached ALS with the request for a feasibility study into rigless/through tubing ESP deployment.
System Integration Testing (SIT) is carried out to ensure all equipment can be assembled as it would be at site and tested according to the specified requirements in the quality plan. The SIT gives an opportunity to identify and rectify any problems prior to shipping. ALS was requested to be present for the oversighting of the SIT on behalf of the operator. Successful and timely execution of the SIT was completed. Specific improvements made by ALS are demonstrated here.
ALS was requested to conduct a study on different forms of ESP deployments to assess the best option for the field, with a specific focus on evaluating wireline retrievable ESP systems (WRESPs).
ALS provided regular inspections of ESP equipment on behalf of an Operator located in Qatar.
In February 2017, ALS conducted full facility audits of six ESP Supply companies on behalf of an Operator, in an effort to determine which Suppliers were most qualified to meet the Operator’s requirements.
ALS provided ESP technical support for an operator in the development of a new field located offshore China.
ALS conducted system integration tests (SIT’s) for multiple dual POD ESP systems.
ALS conducted a full-scope audit on all manufacturing practices on the behalf of multiple operators.
Don't hesitate to get in touch. Available 24 hours/day to meet your Artificial Lift needs.
+65 6532 4383
+1 405 627 8539
+65 8182 2892
+65 6532 4086
190 Middle Road #11-06 Fortune Centre Singapore 188979